News
News
News

New modular RUMED at the Calw clinic site

The Southwest Clinic Alliance has built a new CSSD / RUMED at the Calw clinic site, Robert-Bosch-Straße 13. In the modern facility, the medical products for 4 clinics will be reprocessed, including medical products of the Critical C level.

The turn-key modular building constructed by MMM will initially start with a capacity of approx. 25,000 StU/year, but the equipment is designed for 45,000 StU/year with the aim of supplying further hospitals with sterile supplies after the planned renovations and new buildings of the hospitals of the Southwest Clinic Alliance.

The floor area of the new building is approx. 520 sqm. The order was placed in April 2022 and at the end of November, 13 modules were delivered and assembled in two days. Completion will take place in the next few weeks. After the commissioning of the medical technology and process validation, trial operation is scheduled for March.

YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

“Made in Germany” medical technology

Washer-disinfectors

  • 1 x Uniclean ML 2220 – 2 EL
  • 2 x Uniclean PL II 30-2 EL
  • 3 x Uniclean PL II 15-2 EL

Steam sterilizers

  • 3 x Selectomat PL 9612–2H with attached steam generator and external vacuum pumps
Modulare AEMP am Klinikstandort Calw

Weitere News

MMM at the DGSV Congress:

This year, MMM once again took part in the DGSV Congress, the annual event organised by the German Society for Sterile ...

Weiterlesen

70 years MMM – Anniversary celebration

Am Gründungstag der MMM, am 21. Mai, haben Michael Koller und die MMM Geschäftsführer rund 150 Gäste aus dem In- und ...

Weiterlesen

Michael Koller appoints Dr. Christian Heuer and Ulrich Krauß as new Managing Directors

The shareholders' meeting of MMM GmbH has announced the appointment of Ulrich Krauß as of 01.03.2024 and Dr. Christian ...

Weiterlesen

Successful participation of the MMM Group at Arab Health 2024

Die Arab Health hat sich im Verlauf der Jahre als eine der maßgeblichen Messen für die Gesundheitsbranche etabliert. ...

Weiterlesen
UPL C-Shuttle

UPL C-Shuttle automation system

Fully automatic loading and unloading for concept 15.30 washer-disinfectors.

Weiterlesen
Modulare AEMP am Klinikstandort Calw

New modular RUMED at the Calw clinic site

The Southwest Clinic Alliance has built a new CSSD / RUMED at the Calw clinic site, Robert-Bosch-Straße 13. In the ...

Weiterlesen

Kontakt

MMM Group
Semmelweisstraße 6
82152 Planegg/Munich
Germany

+49 89 899 18-0 info@mmmgroup.com Contact

Costumer Service

service@mmmgroup.com