News
News
News

MMM Switzerland Secures Prestigious Hospital Project

At the end of February 2025, MMM successfully handed over a major project at the new building of the Kantonsspital Baden (KSB) in the Swiss canton of Aargau to the client, KSB CEO Adrian Schmitter. Mike Schwegler, CEO of MMM Switzerland, is pleased to have completed a showcase project in one of the most innovative hospitals in Switzerland: “With a project volume of over 2.4 million Swiss francs, we equipped a complete CSSD (Central Sterile Services Department) in the hospital’s basement, installed a material airlock on the first floor, and placed both a Vacudes 3001 and an Unotherm 81 KW on the third floor.” According to Marietta Knitsch, CEO of MMM Switzerland, winning the contract for the CSSD in this high-tech hospital was mainly due to excellent personal relationships and MMM’s outstanding reputation in Switzerland.

Success as a Full-Service Provider

Mike Schwegler and Peter Marti, Technical Director at MMM Switzerland, explained how the MMM project team was able to meet all customer needs with tailored, high-level solutions: “The entire CSSD was equipped using our holistic MMM solution. The ventilation concept required airtight zoning in all areas.” Marietta Knitsch added about the project management: “Thanks to the commitment and excellent collaboration of our entire team, all challenges were successfully overcome.” Michael Stöwer, Head of Export Sales, and his team served as the central interface between the various MMM departments and MMM Switzerland. He described their role as follows: “Efficient communication and coordination are essential for a smooth project flow — this is a key role. The team contributed with its in-depth knowledge and many years of project experience, ensuring that all administrative and logistical processes were handled on time and without delays.”

“I’m Very Proud of Our Swiss Team”

Michael Koller, owner of the MMM Group, visited the site to learn about the challenges of the project firsthand. During his tour of the CSSD at KSB, he received detailed insights from the project team and CSSD department head, Varghese Oommen. “I’m proud that our high-quality equipment is represented in this facility. The team has done an outstanding job.” This year, MMM Switzerland, the first of MMM’s subsidiaries, is celebrating its 40th anniversary. “I’ll definitely be there,” Michael Koller confirmed.

Hospital of the Future

Siemens Building Technologies, responsible for the building systems, describes the new KSB facility as one of the “smartest” hospitals. General planner Stefano Ghisleni explains the advantages:“The entire building automation is simply incredible. The facility essentially runs itself and will eventually even be able to self-correct, as everything is fully networked.” In terms of energy efficiency, with its “highly sustainable and integrated energy supply,” the new hospital in Baden is also considered one of the most “innovative” clinics in Switzerland, Ghisleni adds. Architecturally, the hospital emphasizes a healing environment: bright interiors, soft color schemes, and natural materials like wood characterize the design.

The medical technology company Siemens Healthineers, with which KSB has entered an exclusive technology partnership for the hybrid operating theatre, counts the hospital as one of only eight reference hospitals worldwide. In a hybrid OR, patients benefit from faster, safer, and less invasive procedures, as surgical and diagnostic procedures — especially in vascular and spinal surgery — can take place simultaneously. The new hospital also focuses on the needs of patients and staff: a navigation system helps everyone find their way around the facility. Heating, ventilation, air conditioning, lighting, and even medication fridges operate autonomously through sensor technology. According to the Badener Tagblatt, the population of the Canton of Aargau will benefit from these innovations in this “Hospital of the Future.”

More news

MMM Switzerland Secures Prestigious Hospital Project

At the end of February 2025, MMM successfully handed over a major project at the new building of the Kantonsspital Baden ...

Read more

Origin and future

MMM's commemorative publication highlights the founding years, the company's development into the market leader in ...

Read more

MMM at the DGSV Congress:

This year, MMM once again took part in the DGSV Congress, the annual event organised by the German Society for Sterile ...

Read more

70 years MMM – Anniversary celebration

Am Gründungstag der MMM, am 21. Mai, haben Michael Koller und die MMM Geschäftsführer rund 150 Gäste aus dem In- und ...

Read more

Michael Koller appoints Dr. Christian Heuer and Ulrich Krauß as new Managing Directors

The shareholders' meeting of MMM GmbH has announced the appointment of Ulrich Krauß as of 01.03.2024 and Dr. Christian ...

Read more

Successful participation of the MMM Group at Arab Health 2024

Die Arab Health hat sich im Verlauf der Jahre als eine der maßgeblichen Messen für die Gesundheitsbranche etabliert. ...

Read more

Contact information

MMM Group
Semmelweisstraße 6
82152 Planegg/Munich
Germany

+49 89 899 18-0 info@mmmgroup.com Contact

Costumer Service

service@mmmgroup.com